| assignments | solutions | supporting files |
|---|---|---|
| Project Network Planning Techniques: PERT, CPM (PDF) | (PDF) | (PDF) |
| Task-based Design Structure Matrix (DSM) (PDF) | (PDF) | (PDF) |
| Design of a Project Organization (PDF) | (PDF) | (PDF) |
| System Dynamics 1: Simulation of the Rework Cycle (PDF) | (PDF) | (PDF) |
| Cases Studies: Comparison of H/W and S/W Projects (PDF) | (PDF) | (PDF) |
| System Dynamics 2: Project Adaptation (PDF) | (PDF) | (PDF) HW6_Capstone_Past_Project.mdl (MDL) |